An internal fit-out to three floors of the Mitre Building, Greenwich Peninsula for Teach First.

Phoenix Construction Services, Interiors Division were approached by project managers Colliers International to undertake a refurbishment of two floors for Teach First based in The Greenwich Peninsula.

 

The project was tendered for under a design and build contract with ‘Employers Requirements’ and drawings provided. 

 

Phoenix ensured that there was full transparency of the cost and programme, allied with a dedicated and a strategic works programme, construction site map including logistics supported by a comprehensive methodology to execute the project.  Every effort was made to protect all existing fixtures and fittings whilst the refurbishment programme was undertaken. 

 

The purpose of the refurbishment was to ‘light touch and refresh’ key areas that looked tired as well as some operational changes to the business.  The project was successfully completed on time, despite a significant delay due to a site shutdown during the COVID-19 lockdown.  We had to effectively recommence the project, post-lockdown, to subsequently complete the project. 